Illawarra Newsroom

Work on Windang Bridge Thursday and Friday

windang_bridge_edit.jpg

Illawarra road users are advised of upcoming work on Windang Bridge over Lake Illawarra   

The work will be carried out to install additional monitoring equipment onto the underside of Windang Bridge to help plan for future maintenance work, the southbound slow lane and shared footpath will be closed for work on Thursday 18 and Friday 19 July between 9am and 3pm, weather permitting. The northbound shared path will remain open at all times to pedestrians and cyclists during this work. Motorists are advised to allow an additional five minutes travel time, drive to the conditions and follow the directions of signs and traffic control.

Image Credit: Maksym Kozlenko [CC BY-SA 3.0 (https://creativecommons.org/licenses/by-sa/3.0)]